WSB tips
Por Rafael Bortoloti05 de março de 2025 às 11:591 min de leitura

- The FPSO Bacalhau arrived in Brazilian waters, bringing along Monjasa’s first offshore bunkering contract. The bunker trader secured a deal with Subsea7 to supply MGO for the three Boka tugs that towed the FPSO from Singapore.
- Petrobras has concluded the EPRD Subsea Lines bid last friday (28/2).
- Carnival eve is untouchable! Petrobras pushed back two bids that were due last Friday. They are:
- 2x OSRVs: New deadline: March 10th, 2025.
- 1x MPSV: New deadline March 14th, 2025.
More details? comercial@wsb-advisors.com
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



