shell drilling is concluded
Por Rafael Bortoloti16 de outubro de 2023 às 17:151 min de leitura

Shell has concluded another drilling campaign in Brazil. The drilling activities led by semi-submersible rig Noble Developer and supported by PSVs Tantalus Tide, UP Rubi and Vega Challenger at the CM-659 block have officially ended, with all units now being demobilized from their respective Shell contracts. The CM-659 block was acquired by Shell (40%) in partnership with Chevron (35%) and QPI (25%) on the 16th bidding round from ANP. The block is located in the pre-salt area of Campos Basin and Shell had licensed to drill up to 6 wells at the location.
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media
Leia também

Regulatory
ANP releases list of companies eligible for OPP4 and OPC6 licensing rounds
30/06/2026
Regulatory
Karoon assumes full operatorship of Baúna FPSO
02/06/2026
Regulatory
ANP sets date for 2026 O&G bidding rounds
25/05/2026
Regulatory