Saipem’s Castorone arrives in Brazil for Raia gas project
Por Rafael Bortoloti14 de janeiro de 2026 às 10:311 min de leitura

On 15 January 2026, Saipem’s pipelay vessel Castorone arrived in Brazil to start deepwater operations at Equinor’s Raia gas project, in the Campos Basin, about 200 km offshore Rio de Janeiro. The DP3 vessel will install pipelines in water depths of up to 2,900 m, marking the start of the project’s deepwater phase.

Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



