oneenergy
news
Regulatory

PRIO – Wahoo field

Por Rafael Bortoloti04 de março de 2026 às 15:031 min de leitura
Compartilhar
FPSO Valente

PRIO announced on March 3 that it has received the Operating License for Wahoo field, in Campos Basin, from Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis (Ibama) — the final regulatory step before first oil.

With commissioning in its final phase, production will take place via a subsea tieback to the FPSO at Frade Field, leveraging existing infrastructure and optimizing capex.

PRIO acquired a 35.7% stake in Wahoo from bp in 2020. The field is estimated to hold more than 140 million barrels of recoverable resources.

Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.

Reportagem e curadoria por Westhon Media

Leia também