prio drilling
Por Rafael Bortoloti11 de dezembro de 2023 às 17:001 min de leitura

PRIO plans to start drilling four wells in Wahoo field, Campos Basin, in January, the same month in which the IBAMA (Brazilian Institute for the Environment and Renewable Natural Resources) license should be issued. They will be drilled by the Hunter Queen rig, with first oil expected in 2H2024. The company
will create a tieback between the Wahoo and Frade fields which will share the FPSO Frade. McDermott’s CSV Amazon that is lined up to do the tieback, is due to arrive in Brazil between April and May
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



