oneenergy
news
← Back to News
FPSO Frade
News

prio drilling

By Rafael BortolotiDecember 11, 2023 at 05:00 PM1 min read
Share

PRIO plans to start drilling four wells in Wahoo field, Campos Basin, in January, the same month in which the IBAMA (Brazilian Institute for the Environment and Renewable Natural Resources) license should be issued. They will be drilled by the Hunter Queen rig, with first oil expected in 2H2024. The company
will create a tieback between the Wahoo and Frade fields which will share the FPSO Frade. McDermott’s CSV Amazon that is lined up to do the tieback, is due to arrive in Brazil between April and May

This article was produced by Westhon Media for One Energy News.