Petrobras P78 – tunrkey model

Seatrium has officially reinforced that Petrobras contracted the FPSO P-78 under a full turnkey model — a first for the Brazilian operator in FPSO development. While common in the O&G sector, turnkey contracts remain rare for FPSOs, making this case especially notable.
Under this model, the contractor is fully responsible for the entire project lifecycle: engineering, procurement, construction, integration, testing, commissioning and final delivery of a fully operational Floating Production Storage and Offloading unit. Petrobras, as the client, will simply “turn the key” to begin operations.
The FPSO P-78 recently departed Singapore and is en route to Brazil, where it will be installed at the Búzios field in the pre-salt Santos Basin. The platform is scheduled to start production in 2025, with a capacity of up to 180,000 barrels of oil and 7.2 million cubic meters of natural gas per day.
The unit is part of Petrobras’ pre-salt expansion strategy. By the end of 2027, the company expects to deploy four additional FPSOs in the Santos Basin: P-79, P-80, P-82 and P-83.
Discover WSB.One, our proprietary offshore intelligence platform used by top industry players for commercial positioning and strategic decisions.
Follow WSB Advisors on LinkedIn and Instagram for more insights.
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



