oneenergy
news
← Back to News
Plataforma P.61 operando no campo de Papa-Terra na Bacia de Campos
News

Oil production at papa terra

By Rafael BortolotiMay 24, 2023 at 01:22 PM1 min read
Share

Oil production at Papa Terra cluster has been temporarily interrupted by 3R Petroleum due
to restrictions on the offloading system on FPSO 3R-3 as the unit reached the limit of
the available oil storage capacity. A damage was identified on the hose that is used in the
offloading operations (oil transfer from the production platform to the shuttle tanker). The
Company has already started the necessary procedures to replace the damaged section
which is estimated to take up to 10 days, allowing the asset to resume production

This article was produced by Westhon Media for One Energy News.