BW Energy: Golfinho Field
Por Rafael Bortoloti15 de abril de 2025 às 17:071 min de leitura

BW Energy has announced the Final Investment Decision (FID) for a new development at the Golfinho field, targeting increased production, lower operating costs, and an additional 3,000 barrels of oil per day starting in 2027. The company plans to invest approximately USD 107 million in the initiative.
Located in the Espírito Santo Basin, the Golfinho field sits in water depths ranging from 800 to 1,700 meters. BW Energy has held 100% ownership and operatorship of the asset since 2023. Production is handled via the FPSO Cidade de Vitória, also owned by BW Energy.
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



