oneenergy
news

Thursday, October 22, 2026International

One Energy News

← Back to News
Por Onde Anda?

Por Onde Anda? Geonísio Barroso

By Westhon MediaOctober 22, 2026 at 09:46 AM2 min read

Automatically generated translation; may contain errors.

Share

Brazil’s first locally built AHTS is back at work. Its Petrobras contract isn’t.
​
After more than eight months out of service, Geonisio Barroso returned to operational readiness in September 2026 and secured a 90-day spot charter, while its Petrobras agreement remained suspended.

Launched at BrasFELS in Angra dos Reis in 2003 and delivered to Delba Marítima in May 2004, it was the first AHTS built in Brazil. It formed part of a US$94 million, three-vessel programme alongside Yvan Barretto and Haroldo Ramos.


​At 75.6 metres, the DP1 vessel has approximately 154 tonnes of bollard pull. It began its career supporting Petrobras and later operated under different commercial arrangements, including Bourbon Offshore and Asgaard Bourbon.
​
The vessel’s history has included setbacks. In March 2015, it collided with the FPSO Cidade do Rio de Janeiro following a dynamic-positioning reference failure. No injuries or environmental damage were reported, and Brazil’s Maritime Court subsequently archived the case.
​
After a class-renewal drydock in 2024 involving approximately R$11 million in maintenance and equipment work, Geonisio Barroso began a new four-year Petrobras contract in April 2025.
​
In December, however, a mechanical failure interrupted operations. Repairs extended into 2026, with delays involving imported replacement components.
​
For Brazil’s first locally built AHTS, waiting for foreign spare parts became part of the story.
​
On July 31, Columbus Offshore and Petrobras agreed to suspend the charter for 365 days, with the possibility of an earlier restart.
​
Operational capacity was restored in September. Columbus Offshore signed a 90-day spot charter with a private oil-shipping company on September 4, effective from September 2.
​
Since then, Geonisio Barroso has appeared in successive NAVAREA V notices for planned ship-to-ship oil transfer operations south of Santos, including a window covering October 18 to 26.
​
The vessel is back in the market, even as its Petrobras charter remains on hold.
​
Explore Geonisio Barroso’s specifications, contract history and market intelligence on WSB-One: https://wsb-one.com

This article was produced by Westhon Media for One Energy News.