oneenergy
news
Renewables & ESG

Petrobras' Srategic Plan

Por Rafael Bortoloti25 de novembro de 2024 às 12:431 min de leitura
Compartilhar
FPSO Maria Quitéria

Last week, Petrobras released its renewesd Strategic Plan, now covering the period from 2025 to 2029.

Here are some highlights from the oil company’s document:

– The company plans to invest $111 billion across all areas, a 9% increase compared to the forecast for the 2024-2028 period.

– Of this total, $77 billion will be allocated to Exploration & Production (E&P), with 60% directed toward pre-salt assets.

– Petrobras projects total production of 3.2 million barrels of oil and gas equivalent per day (boed), including 2.5 million barrels of oil per day (bpd).

– Ten new production systems are set to be deployed by 2029, utilizing cutting-edge technologies that enable greater efficiency and lower emissions. Nine of these systems are already contracted.

– Production will begin at Raia in 2028, but with Equinor as the operator and Petrobras as the partner.

– There are five projects under development beyond 2029, with six more in the planning stage.

– Investments of $19.6 billion are expected in the Refining, Transportation, Marketing, Petrochemical, and Fertilizer segments, marking a 17% increase compared to the last Strategic Plan.

– A commitment to investing $16.3 billion in energy transition projects.

More details you can check out soon at wsb-advisors.com

Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.

Reportagem e curadoria por Westhon Media

Leia também