ODN I at Petrobras
Por Rafael Bortoloti26 de março de 2026 às 16:371 min de leitura

Foresea has secured a long-term contract with Petrobras to operate the drillship ODN I offshore Brazil, adding about $465 million to its backlog. The agreement covers a 1,443-day campaign in the Mero Field, with operations expected to start in 2027 after the unit’s current contract ends.
The deal includes early termination and extension options. The award highlights strong demand for high-spec rigs in Brazil, where Petrobras continues expanding pre-salt developments to support production growth.
Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.
Reportagem e curadoria por Westhon Media



