oneenergy
news
Company News

Equinor acquires 230 MW onshore wind project in Brazil

Por Rafael Bortoloti25 de março de 2026 às 11:351 min de leitura
Compartilhar

Equinor acquired the Esquina do Vento onshore wind complex, with 230 MW of installed capacity, located in Rio Grande do Norte. The asset was purchased from Vestas and is ready for construction, expected to begin in Q2 2026, with commercial operation planned for 2028.

The project will include 51 wind turbines and an estimated annual generation of around 1 TWh. Development will be led by Rio Energy, with energy commercialization handled by Danske Commodities.

Esta matéria foi produzida pela equipe editorial da Westhon Media para o One Energy News.

Reportagem e curadoria por Westhon Media

Leia também